Polo Ralph Lauren Corporation |
||||
|
This project expanded an operational fulfillment/distribution center, with high pile rack storage by an additional 610,000 gsf.
It was comprised of a conventional structural frame, non-load bearing precast concrete wall panels with multiple MLF walls, a floor stab tolerance of fmin=70, and ESFR Fire Protection System with storage tank. |
![]() |

This project represents Mr. Bowlin's previous experience.
| < Prev | Next > |
|---|
