PM2i - Innovative Facility Solutions graphic Owner in-site Login graphic Owner InSite Login Contact Us Home
profile services projects references working with us
Representative Projects List
 

Polo Ralph Lauren Corporation
Expansion of Distribution Center
Greensboro, NC


polo-ralph-lauren-fulfillment-center.jpg
 

This project expanded an operational fulfillment/distribution center, with high pile rack storage by an additional 610,000 gsf. 
Material handling equipment included Rapistan conveyor routed throughout the three-level mezzanine.

It was comprised of a conventional structural frame, non-load bearing precast concrete wall panels with multiple MLF walls, a floor stab tolerance of fmin=70, and ESFR Fire Protection System with storage tank.
Under a design-build agreement, this facility was completed in 21 months from design start to project completion for $22.5 million. 

polo_logo.gif
 polo-ralph-lauren-high-tolerance-floor-slabs.jpg

polo-ralph-lauren-distribution-center.jpg




 

























This project represents Mr. Bowlin's previous experience.
 
< Prev   Next >
Site Map | Privacy Policy | Terms & Conditions


Copyright © 2007 Project Management Innovations International. All Rights Reserved.

Planning, Design, Build, Finance graphic